2/3 of TAP pipes lowered into ground in Greece, Albania

Around 2/3 of pipes (over 515km out of 765km) have been lowered into the ground as part of construction of the Trans Adriatic Pipeline (TAP) in Greece and Albania.

TAP is a part of the Southern Gas Corridor, which is one of the priority energy projects for the European Union. The project envisages transportation of gas from Azerbaijan's Shah Deniz Stage 2 to the EU countries.

The pipeline will connect to the Trans Anatolian Natural Gas Pipeline (TANAP) on the Turkish-Greek border, run through Greece, Albania and the Adriatic Sea, before coming ashore in Italy's south.

TAP will be 878 kilometers in length (Greece 550 kilometers, Albania 215 kilometers, Adriatic Sea 105 kilometers, and Italy 8 kilometers).

TAP's shareholding is comprised of BP (20 percent), SOCAR (20 percent), Snam S.p.A. (20 percent), Fluxys (19 percent), Enagás (16 percent) and Axpo (5 percent)


© İstifadə edilərkən "Xalq qəzeti"nə istinad olunmalıdır.



  • I Avropa Oyunlarının təəssüratları uzun müddət xatirələrdə yaşayacaq

    I Avropa Oyunlarının təəssüratları uzun müddət xatirələrdə yaşayacaq

  • Hər gün bir tarix, hər gün bir zəfər

    Hər gün bir tarix, hər gün bir zəfər

  • Birinci Avropa Oyunları məşəlinin Bakının mədəniyyət və incəsənət mərkəzlərinə səyahəti

    Birinci Avropa Oyunları məşəlinin Bakının mədəniyyət və incəsənət mərkəzlərinə səyahəti

Most popular



Calendar

Weather